IndustryOil & Gas
ServiceAnti-fouling, Anti-fouling Deck Mounted
Woodside Energy – Karratha Gas Plant
CPCL recently completed the commissioning of its latest Cuprion® CAnDU anti-fouling system for Woodside in Australia at the Karratha Gas Plant, as part of their seawater firewater pump station refurbishment project.
The system is designed to protect the fire water pump caissons, at the Woodside KGP facility in Western Australia.
CPCL supplied a skid mounted reaction vessel and control panel along with a submersible bore hole pump to continuously feed water into the system.
CPCL engineer Motaz Abbas attended the site to commission the system and ensure the system operates within Woodside specifications, whilst Product Manager Matthew Lamb provided a detailed training course.